Project Categories

Home    Projects   Estuarine & Riverine Engineering    Tidal Hydraulics & Hydrodynamic Modeling   Yosemite Canal Wetlands Restoration

Yosemite Canal Wetlands Restoration

Yosemite Canal Wetlands Restoration

San Francisco, CA

The Yosemite Canal Wetlands Restoration is currently an on-going project. Yosemite Canal is part of the Candlestick Point State Park Recreational Area. The purpose of the project is to expand wetlands in the area, provide public access, and improve wildlife habitats. A previous phase of the project involved developing alternatives, estimating construction costs, and preparing a feasibility report. NCI is responsible for hydrodynamic analysis, surveying, preparing grading plans, designing public paths, preparing construction cost estimates, and preparing contract documents.


Our design will consider, and dispose of as necessary, contaminated sediments in the area. The modeling study was part of the wetland restoration project and includes both the hydrodynamic simulation and sediment transport simulation for the Yosemite Canal and South Basin. The RMA2 model within the Surfacewater Modeling System (SMS) was used for the hydrodynamic simulation and the SED2D model was applied for the sediment transport simulation.



Yosemite Canal Wetlands Restoration Yosemite Canal Wetlands Restoration

View more projects in this category (Tidal Hydraulics & Hydrodynamic Modeling)
© 2024 Noble Consultants, Inc.